Connect with us

Hi, what are you looking for?

New Products

Critical Path Launches New Multimedia Content Services for Mobile Consumers

Critical Path Launches New Multimedia Content Services for Mobile Consumers

Memova Mobile 2.0 expands data revenue opportunities for mobile operators

SAN FRANCISCO — February 1, 2006 – Critical Path, Inc. (OTC: CPTH), a leading provider of messaging software and services, today announced the launch of new multimedia content services for consumers with Memova Mobile 2.0. Building upon its initial release as a consumer mobile email solution, Memova Mobile now enables mobile operators to provide easy, on-the-go access to popular multimedia content, such as news, blogs, sports, music, podcasts and other content. Compatible with any MMS-enabled phone, Memova Mobile 2.0 offers mobile operators immediate opportunities to drive MMS traffic and increase data revenue. Memova Mobile 2.0 will be unveiled at the upcoming 3GSM World Congress, February 13-16 in Barcelona, Spain.

“Most mobile operators have yet to see significant uptake of MMS as a person-to-person messaging service,” said John Delaney, principal analyst, Ovum. “To unlock the potential of MMS in the near term, operators need to focus additionally on the power that MMS has to push content out to end users — content that they are already interested in receiving, and which can form the basis of services that are easy to use, low cost and personalized.”

With Memova Mobile 2.0, popular content with photos, graphics, video and audio, in addition to email messages from existing email accounts (Yahoo!, Gmail and others), can be easily mobilized and pushed to mass-market mobile phones. The solution enables operators to leverage their existing MMS infrastructure to get to market quickly with new services targeted at the large installed base of consumers who already have MMS-capable handsets. With Memova Mobile, consumers can easily set up services, discover available content, and choose which email messages, news, blogs, podcasts and other content they want to receive on their phone. Memova Mobile 2.0 provides a powerful user experience that is:

• Easy — Most consumers do not have to change or upgrade their mobile phone, and the service can be set up with a few simple text messages — there is no software to install or configure. Also, because content is pushed to the phone, user discovery and consumption of content is simplified.

• Personalized — Content feeds can be personalized according to the consumer’s interests, and users can easily allow or block email senders so they get only the Messages that Matter.

• Addictive — Memova Mobile pushes email and content that subscribers already use regularly and also suggests preferences to users — enabling easier discovery of content and encouraging greater personalization and frequent, repeat usage.

• Affordable — Leveraging existing MMS infrastructure, Memova Mobile enables operators to minimize costs and offer competitive pricing to subscribers.

“Through our market research, we consistently see that consumers want mobile multimedia content services, but they need a simple discovery, download and content management experience,” said Donald Dew, CTO, Critical Path. “With the release of 2.0, we’re extending the easy, affordable, personalized and addictive nature of Memova Mobile beyond email to multimedia content, presenting significant new opportunities for operators.”

Demonstrations of Memova Mobile 2.0 will be available at 3GSM World Congress in the Critical Path stand — F48, Hall 2.

Advertisement. Scroll to continue reading.

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Advertisement

Latest Products

2026 Clearaudio Compact Phono in Silver and Black Front

New Products

Clearaudio’s $639 Compact Phono supports MM and MC cartridges with 40/60 dB gain, 29 dB MC headroom and a space saving design.

2026 Ray-Ban Meta Audio Glasses Lifestyle 2026 Ray-Ban Meta Audio Glasses Lifestyle

New Products

Ray-Ban Meta Audio combines open-ear sound, Meta AI and 12-hour battery life in camera-free smart glasses starting at $349.

2026 Lewitt LW6 Wireless Studio headphones Lifestyle 2026 Lewitt LW6 Wireless Studio headphones Lifestyle

New Products

LEWITT LW6 wireless studio headphones use UWB for uncompressed PCM audio with 5.8 ms latency, plus Bluetooth, USB-C and 21-hour battery life.

2026 iFi Audio UP Play Max Bluetooth Transmitter 2026 iFi Audio UP Play Max Bluetooth Transmitter

Dongle DACs

The $89 iFi UP Play Max adds aptX Lossless, low latency, dual headphone pairing, a built-in mic and upcoming Auracast to phones and PCs.

2026 Audioengine A2+ Gen3 Powered Desktop Speakers Colors 2026 Audioengine A2+ Gen3 Powered Desktop Speakers Colors

New Products

Audioengine updates the A2+ Gen 3 with aptX Adaptive, Class D amplification, more power, and improved USB audio while keeping the price at $299.

2026 Meta VR Glasses Lifestyle 2026 Meta VR Glasses Lifestyle

Home Theater

Meta is putting Dolby Vision, Dolby Atmos and IMAX Enhanced into 100-gram VR glasses while adding Atmos recording to its AI eyewear.

Gift Ideas?

Hi-Fi, Headphones and Tech Gift Ideas for 2026

Gift Guides

Whether you’re upgrading your home audio setup or hunting for the perfect gift, get a head start on shopping for popular and stylish tech...

You May Also Like

Advertisement

ecoustics is a hi-fi and music magazine offering product reviews, podcasts, news and advice for aspiring audiophiles, home theater enthusiasts and headphone hipsters. Read more →

Copyright © 1999-2026 ecoustics | Disclaimer: We may earn a commission when you buy through links on our site.