Connect with us

Hi, what are you looking for?

New Products

Critical Path Launches New Multimedia Content Services for Mobile Consumers

Critical Path Launches New Multimedia Content Services for Mobile Consumers

Memova Mobile 2.0 expands data revenue opportunities for mobile operators

SAN FRANCISCO — February 1, 2006 – Critical Path, Inc. (OTC: CPTH), a leading provider of messaging software and services, today announced the launch of new multimedia content services for consumers with Memova Mobile 2.0. Building upon its initial release as a consumer mobile email solution, Memova Mobile now enables mobile operators to provide easy, on-the-go access to popular multimedia content, such as news, blogs, sports, music, podcasts and other content. Compatible with any MMS-enabled phone, Memova Mobile 2.0 offers mobile operators immediate opportunities to drive MMS traffic and increase data revenue. Memova Mobile 2.0 will be unveiled at the upcoming 3GSM World Congress, February 13-16 in Barcelona, Spain.

“Most mobile operators have yet to see significant uptake of MMS as a person-to-person messaging service,” said John Delaney, principal analyst, Ovum. “To unlock the potential of MMS in the near term, operators need to focus additionally on the power that MMS has to push content out to end users — content that they are already interested in receiving, and which can form the basis of services that are easy to use, low cost and personalized.”

With Memova Mobile 2.0, popular content with photos, graphics, video and audio, in addition to email messages from existing email accounts (Yahoo!, Gmail and others), can be easily mobilized and pushed to mass-market mobile phones. The solution enables operators to leverage their existing MMS infrastructure to get to market quickly with new services targeted at the large installed base of consumers who already have MMS-capable handsets. With Memova Mobile, consumers can easily set up services, discover available content, and choose which email messages, news, blogs, podcasts and other content they want to receive on their phone. Memova Mobile 2.0 provides a powerful user experience that is:

• Easy — Most consumers do not have to change or upgrade their mobile phone, and the service can be set up with a few simple text messages — there is no software to install or configure. Also, because content is pushed to the phone, user discovery and consumption of content is simplified.

• Personalized — Content feeds can be personalized according to the consumer’s interests, and users can easily allow or block email senders so they get only the Messages that Matter.

• Addictive — Memova Mobile pushes email and content that subscribers already use regularly and also suggests preferences to users — enabling easier discovery of content and encouraging greater personalization and frequent, repeat usage.

• Affordable — Leveraging existing MMS infrastructure, Memova Mobile enables operators to minimize costs and offer competitive pricing to subscribers.

“Through our market research, we consistently see that consumers want mobile multimedia content services, but they need a simple discovery, download and content management experience,” said Donald Dew, CTO, Critical Path. “With the release of 2.0, we’re extending the easy, affordable, personalized and addictive nature of Memova Mobile beyond email to multimedia content, presenting significant new opportunities for operators.”

Demonstrations of Memova Mobile 2.0 will be available at 3GSM World Congress in the Critical Path stand — F48, Hall 2.

Advertisement. Scroll to continue reading.

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Advertisement

Latest Products

Revel PerForma4 F346 Floorstanding Loudspeaker Grilles On and Off in Natural and Black Walnut

Floorstanding Speakers

Revel Performa4 loudspeakers feature DCC drivers and an Acoustic Lens waveguide for both hi-fi and home theater systems with matching subwoofer and center channel.

2026 Samsung The Frame Pro vs. The Frame 4K Art TVs 2026 Samsung The Frame Pro vs. The Frame 4K Art TVs

New Products

Samsung’s 2026 The Frame and Frame Pro TVs blend 4K performance with Art Mode, matte display, and cleaner wireless setup for a true gallery...

Cayin N8iii DAP Angle Side Buttons Cayin N8iii DAP Angle Side Buttons

DAPs

Cayin N8iii launches at $3,999 with tube modes, AKM DAC, up to 1.285 watts of output, and a 13500mAh battery, but is it enough...

Samsung 2026 OLED TVs Samsung 2026 OLED TVs

New Products

This year, LG is offering its QD-OLED TV in two strikingly different designs. Which one would you pick?

Bang & Olufsen Beolab 90 Zenith and Monarch Loudspeakers Bang & Olufsen Beolab 90 Zenith and Monarch Loudspeakers

Floorstanding Speakers

Bang & Olufsen's Beolab 90 Zenith and Monarch Editions look like they escaped a Cylon basestar, with extreme design and six figure pricing to...

Kaleidescape Terra Prime Movie Server Kaleidescape Terra Prime Movie Server

Blu-ray, DVD & 4K Media Players

Kaleidescape’s $34,995 Terra Prime 120TB Movie Server stores 2,000 4K movies, and downloads in minutes over 2.5G Ethernet with lossless audio.

Gift Ideas?

Kaleidescape Paradise Theater Ultimate Man Cave

Gift Guides

Building the ultimate man cave in 2026? Discover the best home theater, hi-fi, and tech upgrades that deliver real performance, not hype.

You May Also Like

Advertisement

ecoustics is a hi-fi and music magazine offering product reviews, podcasts, news and advice for aspiring audiophiles, home theater enthusiasts and headphone hipsters. Read more

Copyright © 1999-2026 ecoustics | Disclaimer: We may earn a commission when you buy through links on our site.